Our History
A pioneering company, customer-first since 1990.
We are involved in technology and in manufacturing, but we are neither a technology company nor a manufacturer at heart. We are a pioneering company — and innovation here has one test: does it create value for our clients? The people who use, build with and sell what we make have sat at the centre of every decision since 1990.
Our founder
Peter Zwaans — an unapologetic refusal to quit.
Rapid Building Systems began with a founder facing an industry that had no appetite for deviating from standard construction materials — and when consistent, reliable plaster could not be had, the experts and advisers told him plainly: it can't be done. Peter's answer became the company's conviction: "it has not been done" should never mean "it cannot be done." What followed was not luck. It was a tenacious willingness to do the hard work of finding a way to make it happen.
That is how a small Australian company came to hold world firsts — a fluid-bed dryer, and a modular load-bearing walling system — decades before there was a market for such technology. And never innovation for its own sake: it was questioning the status quo to find the simple approach that is cost-effective for our clients — clients we see through long-term partnership, not a single sale.
Peter's ultimate goal ran deeper still: a pursuit of the truth, instilled through the whole organisation — the standard that once we give our word, there is no alternative but to guarantee the work is done.
The story
Three decades of refusing to outsource the hard part.
The vision arrived in January 1990: bring an ecologically sound, cost- and time-efficient walling system to commercial reality — good enough for quality housing and high-rise, and affordable enough for the people living without either. That vision became Rapidwall.
Then the vision met its obstacle: the quality of plaster around the world varied wildly, and Rapidwall demanded better. So we built the Rapidflow Calciner — a fluid-bed machine that makes premium plaster from natural, flue-gas, phospho or chemical gypsum. The obstacle became a second business. A fire-protection derivative, Rapidseal, became a third. The chain was complete.
- 1990
The vision
Peter Zwaans sketches an eco-friendly, load-bearing walling system — fast to build, priced for everyone, including the people housing forgets.
- 1990
RBS founded in Australia
Rapid Building Systems Pty Ltd begins turning the vision into panels.
- 1990s
Australia builds with it
Townhouses, waterside apartments, winery buildings and multi-storey residential rise across SA, NSW and Victoria.
- 2000s
The calciner & the world
Rapidflow solves the plaster problem; plants and equipment follow in Malaysia, China, India and Oman.
- 2009
Global recognition
Global Gypsum Product of the Year; UN-Habitat recognises Rapidwall as good practice in sustainable urbanisation.
- 2013
UN carbon-credit certification
Rapidwall becomes the first — and still the only — building material granted UNFCCC Certified Emission Reduction eligibility.
What we hold to
Three commitments, three decades kept.
The truth is worth the test.
Every claim is measured before it is made — in laboratories, on sites, over decades — and once we give our word, there is no alternative but to keep it.
The refusal to quit.
"It has not been done" has never meant "it cannot be done." We do the hard work of finding the way — and we are unashamed to pursue high-value commercial solutions in doing so.
The work is for people.
The dignity of every person — our staff, our clients, the family behind the wall, the worker behind the barrier — sets the standard for how we engineer, test and deliver.
Meet the company behind the chain.
We answer our own correspondence, and we would be glad to hear from you.
Get in touch