Rapid Building Systems

The value chain

One mineral. One chain. Every link ours.

Most suppliers sell you a link — a calciner, a panel, a coating — and leave you to weld the chain yourself. We spent three decades engineering the whole thing, because the quality of each link depends on the one before it. Feedstock to finished outcome, one accountable partner.

Explore your market.

Select an icon to find the solutions relevant to you. EVERY TILE IS A LIVE LINK →

01 · FEEDSTOCK 02 · CALCINE 03 · PLASTER 04 · PRODUCTS 05 · OUTCOMES NATURAL GYPSUM mined rock FGD GYPSUM from power stations PHOSPHOGYPSUM fertiliser industry CHEMICAL GYPSUM industrial process RAPIDFLOW CALCINER Variable gypsum in. Premium plaster out. PREMIUM PLASTER Consistent quality RAPIDWALL Load-bearinggypsum wall system RAPID MINING PLASTERS High-strength, fast-setEngineered for safety SPECIALTY PLASTERS Engineered formulations HOMES & BUILDINGS Walls up in a day SAFER MINES Rapid barriers ·controlled airflow VALUE INNOVATION More from gypsum DELIVERED AS · COMPLETE PLANTS · TECHNOLOGY LICENSING · PRODUCT SUPPLY · PROJECT SUPPORT One partner across the whole chain — Rapid Building Systems, Australia.

SWIPE THE CHAIN →

Links 01–02 · Feedstock & calcining

Any gypsum in. The same premium plaster out.

Natural rock is welcome — but the chain was built for the harder feedstocks: flue-gas gypsum from power stations, phosphogypsum from fertiliser production, chemical gypsum from industry. Streams the world has stockpiled, waiting for a better use.

The Rapidflow Calciner is what makes this possible. Its fluid-bed design calcines evenly and precisely, producing consistently premium plaster from feedstocks that defeat conventional kettles. It exists because Rapidwall demanded plaster the open market could not reliably supply — so we built the machine ourselves.

The valorisation offer in full
The Rapidflow fluid-bed calciner installed at the Chongqing plant, China.
Rapidflow calciner, Chongqing, China — 25 tonnes per hour (output), running on 100% phosphogypsum.

Link 05 · How the chain reaches you

Four ways to plug in — from a pallet to a whole plant.

Complete plants

We design, supply and commission your facility.

Rapidflow calcination and Rapidwall manufacturing plants, established with partners across Malaysia, China, India and Oman — and in development in Brazil.

Technology licensing

Exclusive rights for your region.

Manufacture and market Rapidwall and Rapidseal under licence — exclusive national sales and marketing rights within a defined territory.

Product supply

Panels, plaster and fire products, delivered.

Buy the outputs without owning the plant — Rapidwall panels cut to your drawings, Rapidseal for your operation, plaster for your market.

Project support

Engineering, manuals and training.

Structural design and construction manuals — including those developed with IIT Madras — a standard-details library, feedstock testing, and hands-on commissioning support.

Why one chain beats many links

Quality holds.

Plaster consistency was the industry's weak link, so we built the calciner rather than tolerate it. Every downstream product inherits that standard.

Economics compound.

The same tonne of gypsum earns margin at every link — calcined, moulded, sprayed or sold — instead of paying stockpile costs forever.

The mission survives.

A chain we control end-to-end can be pointed at the outcomes that matter: dignified homes for families, and shifts that end safely at the surface.

Where does your organisation touch the chain?

Whether you hold the gypsum, need the walls, or carry the fire risk — there is a link built for you, and a team in Australia ready to walk it with you.

Start the conversation